Main Topic                            : Integrated Project – Design & Build A Small Scale Building

OBJECTIVES                        :

  •  Based on the presentation dawings of their respective Amphiteatre Stage design, each group needs to build or construct the scale size model of their stage (1:5 scale).
  • Students are given two weeks to plan and complete the model construction process.
  • To ensure that the stage model is successfully constructed within the stipulated time, students are encouraged to discuss and for several sub-groups which are responsible for different parts of construction.
  • Each group also needs to provide the actual costing for their stage model construction (Model Actual Cost) and submit it along with the physical model.



    Finally we did it, our "baby" after 2 sleepless week. Even our group have some arguments because of communication problem but we solved it and work co-operate as a group.  


    The design of the amphitheatre stage is inspired by coconut leaves. At the behind of the stage that design five coconut leaf to presenting our design concept. 


    This is the our amphitheatre stage with additional lighting effect.  